
PTSD
Precision Track Safety Directives

PTSD
Build the draft. The RWIC verifies it.
Planning draft only. PTSD does not create railroad authority or choose the final protection method. A qualified RWIC/EIC must verify the site, current sources, field conditions, limits, and protection before use.
Current verified field record
No active job setup.
Job Setups
Draft → RWIC/EIC verified → briefing verified → active.
Job Safety Briefing
Choose a job setup first.
DRAFT — NOT FOR FIELD USE. Electronic sharing never replaces the required verbal job safety briefing.
Settings
Approved territory sources and authorized users.